Budget planner

Estimate PBR material cost and delivery time.

Choose the closest production scope. The result is a planning range, not a binding quote, and no information is uploaded or stored.

Additional requirements

Planning range

EUR 350-650

0.5-1.5 production days

For one reference-led production material with normal detail and an agreed PBR map set.

This estimate excludes VAT, third-party licenses and major scope changes. Capacity, references and technical requirements are checked before a formal quote.

Why the result is a range

A “PBR material” can mean two hours of repair or two weeks of system work.

The visible render is only one part of the scope. Source readability, parameter design, variants, engine packing, shader validation, documentation and review rounds can take as much time as the first visual pass.

If you only need a common background surface, check a stock library first. If you need an exact finish, art direction or reusable system, the custom range becomes relevant.